2.0 Technology Description

The following Sections discuss both the purpose and operational details of the components that make up the RASSP-MI.

2.1 Input Interfaces

The following Sections discuss two interfaces that import electronic design data into the RASSP-MI that have been developed. The first imports design data created by Mentor Graphics Corporation's Board Station PCA design product. The second imports design data represented by the EDIF 4 0 0 (Level 0) standard. The mechanism by which Mentor Board Station and EDIF 4 0 0 are supported is by converting these data representations into the STEP AP210 standard PCA design data representation. STEP AP210 is the representation used internally by RASSP-MI components. The same approach can be used to add support to the RASSP-MI for other electronic CAD (ECAD) systems and standards as necessary.

2.1.1 Support for Mentor Graphics Corporation's Board Station

Support for PCA design information created using Mentor's Board Station product is provided by The Mentor Board Station to STEP Application Protocol 210 (AP210) EXPRESS Driven Data Converter[Hin94]. This Section discusses the operation of this data converter in detail. Figure 2.1.1-1 presents a data flow diagram that illustrates how the data converter operates and how it fits into the overall RASSP-MI system. The definition of "RASSP Manufacturing Interface Core Capabilities" is all functions of the RASSP-MI that perform operations other than facilitating input and output.

Figure 2 - 1: Mentor Board Station Support in the RASSP Manufacturing Interface


The Mentor Board Station Interface is implemented by the mentor2step executable. This program is assisted by two C-shell scripts that collect Mentor Board Station data files and simplify the user interface for the most common usage of the data converter. The remainder of this Section discusses the operation of these components in detail.

2.1.1.1 Mentor Board Station PCA Design File Preparation using get­mentor­design

The get­mentor­design script prepares Mentor Board Station PCA design files for use by mentor2step. The calling syntax of this command is as follows:

get­mentor­design [design_directory_name]

This command acquires and renames Mentor Board Station PCA design files. The files are acquired from <design_directory_name>, renamed, and placed in the current working directory. Once these operations are complete, the PCA design data is accessible to mentor2step.

The get-mentor-design script acquires the following MGC PCA design files from the <design_directory_name>/pcb directory:

These files normally occur under the pcb directory except for ascii_parts_file, which can be generated from within the Board Station LAYOUT tool. The <max> notation indicates the largest integer for all files matching the pattern name.name_<integer>.

The get-mentor-design script copies the PCA design files to the directory where the script is executing and changes their names to the following, respectively:

The mentor2step module uses these files directly.

2.1.1.2 Mentor Board Station PCA Design Data Conversion Using mentor2step

The mentor2step data converter converts Mentor Board Station design data into STEP AP210 format. The calling syntax of the data converter is as follows:

mentor2step [­d ­q ­pd ­v ­vv ­sm -do_report -nsa -ss] [­pf <output_step_file>]

mentor2step [­er ecad_step_file] [­d ­q ­pd ­v ­vv ­sm -do_report -ss]

[­pf <output_step_file>]

Executing mentor2step with no arguments causes it to print out a description of the available options. Mentor2step converts Mentor Board Station PCA design data files into a file that conforms syntactically to the STEP Part 21 (ISO/IS 10303­21) specification and semantically to the STEP Application Protocol 210 specification.

2.1.1.3 Mentor Board Station PCA Design Data Conversion Using mentor2ap210

Mentor2ap210 is the top-level script that automates much of the Mentor Board Station to AP210 data conversion process. The calling syntax of this module is as follows:

mentor2ap210 [mentor2step options] [output_file_name]

[mentor_design_directory_name]

The mentor2ap210 script acquires MGC PCA design data by executing get-mentor-design (discussed in Section 2). It then executes the mentor2step data converter to translate the MGC PCA design data to AP210 format.

2.1.2 Support for EDIF 4 0 0 Level 0

PCA design data represented in EDIF 4 0 0 Level 0 form is supported in the RASSP-MI. Figure 2.1.2-1 shows how the EDIF 4 0 0 Level 0 Interface fits into the RASSP-MI architecturally as well as the interface's internal architecture and data flow. The EDIF 4 0 0 file format is first converted into its EDIF 4 0 0 Information Model equivalent. The Information Model is represented in the EXPRESS[ISO94] data modeling language, making it possible to apply the EXPRESS Driven Data Conversion technique. This technique was used in the development of the EDIF 4 0 0 to STEP AP210 Semantic Conversion Module. Currently, only the subset of EDIF 4 0 0 Level 0 necessary to generate GenCAD data files (discussed in Section 2.2) is supported by the RASSP-MI. It is expected that the coverage of the data converter will be expanded in the future. Areas of coverage that would be useful to add include functional (gate-level) and pin swapping information.

Figure 2.1.2 - 1: EDIF 4 0 0 Level 0 Support in the RASSP Manufacturing Interface



The syntax of the data converter is as follows:

edif400l0_to_ap210 [-d -q -v] <input_file_name> [<output_file_name>]

Executing the command with no arguments causes a description of available options to be printed. If an output file name is not provided, the automatically generated file name will have the following structure: <input_file_name>.step.

Since there will always be a single input file, the user interface of this data converter is significantly simpler than the one that provides support for Mentor Board Station.

2.2 Output Interfaces

Once an electronic design has been completed and released to a manufacturing facility for production, a significant amount of information remains to be generated based upon the design to be manufactured. For example, Numeric Control (NC) programs must be generated to guide the operation of automatic component placement equipment. Many other types of manufacturing machines on the production line also require NC programs or parameter files to guide their operation. In addition, automatic testing equipment requires detailed knowledge of the design in order to operate correctly.

The RASSP Manufacturing Interface currently provides support for Mitron's CIMBridge, a system which provides the kind of manufacturing support described above. Design information is entered into the CIMBridge system via a file format called GenCAD. The RASSP-MI supports this system by synthesizing GenCAD file from PCA design data represented in STEP AP210 form. This is shown in Figure 2.2-1

Figure 2.2- 1: Support for Mitron's CIMBridge in the RASSP Manufacturing Interface


The GenCAD conversion module is available in the RASSP-MI environment as the a2g executable. The syntax for this module is as follows:

a2g [-d -q -v -vv] [-sr <STEP AP210 File Name>] [-gf <GenCAD File Name>]

A description of the options and defaults of a2g is printed if the program is executed with no arguments.

2.3 Manufacturing Resource Editor (MRE)

The Manufacturing Resource Editor (MRE) facilitates the capture of detailed manufacturing process information. Once captured, this manufacturing capability data may be used by other components of the RASSP Manufacturing Interface. Specifically, the MRE facilitates the capture of information regarding the following manufacturing elements:

This Section discusses the relationships between each of the above items. Also, the information captured for each item is explained.

This rest of this section is organized as follows. Section 2.3.1 discusses operational aspects of the MRE. Section 2.3.2 provides the user with factory configuration guidelines. Advice is provided to assist the user in making effective and efficient use of the MRE. More detail concerning the operation of the MRE can be found in the Build I Manufacturing Interface User's Manual[SCRA95].

2.3.1 MRE Operational Overview

This Section discusses operational basics of the MRE. Each of the nine Main Menu items offered by the MRE are discussed. Several menu items activate separate data entry windows. Data entry fields within these windows may be editable or static (i.e. informational only). Editable fields are labeled with red text, while static fields are labeled with blue text. Multiple data entry screens may be active simultaneously; it is not necessary to close most data entry screens before opening another. When an editable field is modified in one data entry screen while other screens are active that display the same field, the displayed fields are dynamically updated.

Major Operations (main menu bar selections)

Figure 2.3.1-1 provides a hierarchical breakdown of the menu items available from the MRE's main menu. Figure 2.3.1-2 shows the nine top-level MRE menu selections as they appear to the user. The capabilities and functions invoked by these menu items are discussed in this Section.

Figure 2.3.1- 1: MRE Menu Options Tree

Figure 2.3.1- 2: Main MRE Window

File

The File menu items provide access to the following capabilities: Causes the MRE to read factory data from the file f_data.ob. This binary data file contains objects in the native format of the underlying object-oriented framework upon which the MRE is built. This underlying framework is ProKappa, a knowledge-base product offered by Intellicorp, Inc. Removes the current data set from the MRE. This command only affects objects in memory. Version 2.5.9 of the MRE has a known problem related to this command. If the user selects this command, and then attempts to Read STEP (described below) the MRE will abort. In general, use of the Unload Data command is not recommended. Stores MRE data to the file "f_data.ob". Stores MRE data to the file "f_data.step". This file conforms to the proposed STEP AP220 factory schema definition. Loads AP220 formatted data from "f_data.step" Terminates the current MRE session

Companies

The Companies menu is used to define companies and virtual corporations. The entities created with these menu items are displayed in the Companies list box in the top-level MRE window. Companies are composed of factories. Factories and their underlying substructure can be transferred from one company to another. Joint ownership of factories is not supported. Creates a new company. A dialog box appears allowing entry of company address, multiple phone numbers, and annual overhead cost information. Allows the user to add or change the address, phone numbers, and annual overhead cost information of the selected company. Allows the user to remove the selected company from the database. This will not be allowed if the company owns factories. A company's assets must be deleted or reassigned before a company can be removed.

Factories

The Factory menu is used to create and modify PCA manufacturing facilities. Assets such as production machines, employees and environmental facilities may be assigned to a factory. Assigning an asset to a factory implies that it physically resides at the factory location and implies that the factory "owns" the asset. Factory-owned assets may be further grouped into work centers and production lines. Assets are initially classified as available. When an asset is assigned to a work center or production line, it is reclassified as assigned. Creates a new factory and assigns it to the currently selected company. A dialog box appears allowing entry of factory address, multiple phone numbers, and annual overhead cost information. Allows the user to add or change the address, phone numbers, and annual overhead cost information of the selected factory. Removes the selected factory from the database. This will not be allowed if the selected factory has production lines. Factory assets must be deleted or reassigned before a factory can be removed. Allows the user to enter the PCA technology characteristics and type supported by the factory. Allows the user to assign a factory to the currently selected company.

Production Lines

Production lines are composed of two components: Good practice values must be provided by the user. These parameters provide the recommended operating "boundary conditions" for the production line. Operating outside of these boundaries may be possible, but will result in significantly reduced production line effectiveness and is not recommended. These boundaries apply to features of PCA designs that may be processed by the production line. An example of a Good Practice PCA layout constraint is minimum DIP to DIP spacing. Work Centers are clusters of production machines and employees that perform a major PCA manufacturing task. An example of a task that a Work Center would perform is surface mount component placement. Thus, Work Centers provide a detailed view of the machines and employees that compose a production line, while the Good Practice values summarize the overall capabilities of the production line. Creates a new production line and assigns it to the currently selected factory. The new production line inherits the Good practice "global" values defined for the MRE session. These inherited values may be modified by editing the Good Practice "instance" values of the production line. The new production line's good practice values may be modified by selecting Production Lines Practice Instance Values from the main menu. Creates an exact copy of the currently selected production line. The user is promoted for the new production line's name. This capability is useful for creating new production lines that are similar to an existing production line quickly. Allows the user to add or change attributes of the selected production line. Removes the selected production line from memory. All of the deleted production line's work centers are also deleted. All of the deleted work center's employees and machines are re-classified from assigned to available. Allows the user to edit the "global" or "instance" Good Practice values. The "global" values apply to the entire MRE session. When a new production line is created, the "instance" values that apply to that production line are inherited from the "global" values. The "instance" values apply only to the selected production line. The following Good Practice value types are supported: Miscellaneous items include component orientation rules, whether fiducials are required or not, clearance required for hand-inserted components, and component-to-PCB-edge clearance. Switching between the three panels of Good Practice editing screen is done by selecting one of the above items from the Good Practice menu bar. Good Practice values must be entered by the user. They are based on the experience of manufacturing engineers familiar with equipment present in the production line. This feature of the Good Practice values distinguishes them from the values present in the Producibility Summary, which are generated by the MRE from PCA manufacturing machine attributes. The Producibility Summary is generated by the MRE and is based on the generic machine function definitions that apply to the selected production line. The generic machines that are relevant to the selected production line are those generic machines that define the capabilities of the production machines that make up the Work Centers that compose the production line. Addition, deletion, or modification of one or more of a production line's production machines invalidates the associated Producibility Summary. This is indicated by changing the Producibility Summary's status flag from valid to invalid. Regeneration of the Producibility Summary will update its contents and set the status flag to valid. This is accomplished by selecting Production Lines Producibility Summary Generate from the main menu. The Producibility Summary includes the following information: The Producibility Summary status is shown in the upper-right corner of the producibility summary screen. The status may also be viewed by selecting Production Lines Producibility Summary Report Status.

Work Centers

A Work center is a cluster of Employees and Production Machines that perform a specific PCA manufacturing task. Creates a new Work Center and assigns it to the currently selected Factory and Production Line. Work Centers are owned by a factory and may be used by one or more Production Lines within the owning factory. The user may enter a name for the new work center, or may choose a name from the provided pick list. Allows the user to modify Work Center attributes. Removes the selected Work Center from memory, unless the Work Center is assigned to multiple Production Lines. In this case, only the reference to the Work Center within the context of the currently selected Production Line is deleted. When a Work Center that is assigned to only one Production line is deleted, its assigned employees and machines are re-classified as available. Allows the user to add an existing Work Center owned by the selected factory to the presently selected Production Line. The Assign data entry window shows a list of Work Centers that are not currently assigned to the selected production line. When the user selects one of these Work Centers, the "Machinery" and "Operators" list panels at the bottom of the window show the Production Machines and their assigned operators.

Machinery

Management of PCA manufacturing machines is discussed in this section. Machine definitions are called "Generic" machines in the MRE. Instances of Generic Machines are called Production Machines. Conceptually, a Generic Machine is a specific make and model of PCA manufacturing machine. A Generic Machine includes all of the information necessary to define the machine's capabilities and limits. A Production Machine is an occurrence of a Generic Machine owned by a Factory and possibly assigned to a Work Center. Production Machines assigned to a Work Center have a status of assigned. Production Machines that are not assigned to a Work Center have a status of available. A Production Machine may have an Employee assigned to it as a custodian. Once assigned to a Work Center, a Production Machine may be assigned operators. MRE functions that operate on Generic and Production Machines are discussed below. Activates the Generic Machine Configurator window, which allows the user to create, edit and copy generic machines. Provides a list of all Production Machines owned by the selected Factory. Selecting a Production Machine from the list causes the following information to be displayed: The Generic Machine and assigned Work Center information may not be modified. The Production Machine information fields and Custodian are modifiable. Provides a list of available Production Machines for the user to choose from. When a Production Machine is selected, descriptive information is displayed. If the user selects the OK button, the selected Production Machine is assigned to the currently selected Work Center. The name of the Work Center being assigned to is displayed in the top of this window. Multiple Production Machines may be assigned by repeatedly selecting Production Machines followed by selecting the OK button. Selecting the CLOSE button terminates the window. Removes the selected Production Machine from the Work Center to which it is currently assigned. The machine's status is changed from assigned to available. Provides a list of Production Machines owned by the selected Factory. A Production Machine may be retired by selecting it from the list followed by selecting OK. Retired machines are not preserved by the MRE. Retiring a machine is equivalent to deleting it. Before a Production Machine can be retired, it must have been Released. Multiple machines can be retired by repeatedly selecting Production Machines followed by selecting OK. Selecting the CLOSE button terminates the window.

2.3.1.1.7 Human Resources

PCA manufacturing technicians and engineers are called "Employees" in the MRE. Employees, like Production Machines, are owned by Factories. Employees may be assigned to Work Centers as operators and to Generic Machines as custodians. An Employee's status is set to assigned when the Employee is assigned to a Work Center or a Generic Machine. Unassigned Employees have a status of available. Provides a list of defined Employees. Selecting an Employee causes the following information to be displayed: Definitional information includes the Employees full name, "clock" number, labor grade, and hourly rate. Assignments to Work Centers and Generic Machines are also displayed. Finally, skill Certifications and their expiration dates are shown. Definitional information and Certifications are modifiable; Assignments are not. Allows the user to create a new Employee. A window appears and requests the new Employee's name. After entering the name and selecting OK, a different window appears requesting Employee information. Once the requested information has been entered, selecting OK completes the hiring process. The new employee are assigned to the selected factory with a status of available. Provides a list of Employees owned by the selected Factory. An Employee is deleted by selecting that Employee from the list and selecting the OK button. All of the Employee's assignments must have been Released or the delete request will be denied. Provides a list of available Employees owned by the selected Factory. An Employee is assigned to the selected Work Center by selecting the Employee followed by selecting the OK button. Multiple Employees may be assigned by repeatedly selecting Employees followed by selecting the OK button. Selecting the CLOSE button terminates the window. Releases selected employees from their current assignments and changes their status to available. Assignments from which employees may be released include assignments to Work Centers and Production Machines. Provides a list of defined skill Certifications. Certifications required by a manufacturing facility may be assigned to the selected Factory by selecting the Certification followed by selecting ADD. A list of Certifications relevant to the selected Factory is shown in the bottom panel of the Certifications window. Employees owned by the selected Factory may have one or more of these Certifications assigned to them. This is accomplished by selecting the Human Resources View/Edit option, selecting an Employee, selecting a Certification, and finally selecting ADD. Note the Query menu option of the Certifications data entry screen performs no function in version 2.5.9 of the MRE.

Environmental Facilities

Management of environmental facilities (such as clean rooms) is discussed in this section. Selecting Environmental Facilities View/Edit from the main menu activates the environmental facility Workbench. The Workbench supports the following functions: Creates a new environmental facility and assigns it to the selected factory. Removes the selected Environmental Facility from the selected Factory. Work Centers assigned to the Environmental Facility are not deleted. Allows the user to add, delete, and modify attributes associated with the selected Environmental Facility. Allows the user to add, delete, and modify the statistical properties of a Characteristic associated with the selected Environmental Facility. Allows the user to add or remove Work Centers from the selected Environmental Facility.

UtilitiesThe following items are available from the Utilities menu:

Flushes the MRE's window panel cache. The first time a data entry or other type of window is displayed by the MRE, data objects are created to support the widgets and panels that compose the window. When the window is closed, these data objects are not deleted. Therefore, when the same window is requested again, it is displayed more quickly. However, if memory consumption becomes an issue, Reset Frames may be used to clear these data objects from memory. Otherwise, this utility should not be used as it will degrade performance. Finds and deleted data objects that have been damaged. This utility may be needed if the f_data.ob file becomes damaged. Populates the name attribute of all data objects with the type-name of the data object itself. This exists for debugging purposes only and should not be used by the MRE user. Modifies the type-name of all data objects to be the same as the contents of their name attributes. This exists for debugging purposes only and should not be used by the MRE user. Update and read an f_data.ob file from an older version of the MRE. Allows the user to alter a variety of global options. The user may perform the following tasks: Selecting the Set Options menu item activates a workbench that facilitates selection of available options. Once saved, these options apply for the current and subsequent MRE sessions. Lists the current version of the MRE and provides a brief description.

2.3.2 Data Population Constraints

Constraints exist on the order in which objects may be created in the MRE. This section summarizes these constraints to help the user more efficiently capture manufacturing capabilities information using the MRE.The first objects created in the MRE must be items that can exist independently. These include Companies and global Good Practice values. Once a Company exists, Factories may be created. The Factory is the owner of most other items managed by the MRE, any of which may be created once a Factory exists. These items are listed below: Once a Production Line exists, Work Centers may be created. A Work Center may then have Production Machines and Employees assigned to it.

2.3.3 Variable and Fixed Cost Computations

The fixed and variable costs for the selected production line are computed and displayed in the Producibility Summary screen, which is activated by selecting the main menu option Production Lines Producibility Summary Generate. These approximated costs are derived from five cost data specifications entered into the MRE. Fixed costs of a production line are computed according to the following formula:

Figure 2 - ?: XXXX

Variable costs of a production line are computed as the sum of these three components:


 
Cost Type
Cost Item
Menu Path
Fixed Costs
Company Overhead  Companies Edit 
($)
Factory Overhead  Factories Edit 
Variable Costs
Production Line Support  Production Line Edit 
($/Hour)
Machine Operation  Machinery Production Machinery View/Edit 
Human Resources Human Resources View/Edit 
 

Figure 2.3.3- 1: Production Cost Derivation Summary

2.4 Producibility Analysis

The Producibility Analyzer (PA) used within the RASSP-MI is a commercialized version of the Producibility Advisor. The Producibility Advisor was developed as part of a previous, government funded effort and significantly enhanced as part of the RASSP Manufacturing Interface effort. The Producibility Analyzer is commercially available from Mitron Corporation.

The PA evaluates PCA product data within the context of specific PCA manufacturing constraints. The use of specific PCA design and production line characteristics enables a more precise analysis than may be obtained using generic producibility guidelines exclusively. The PA uses product data in GenCAD format, as do all of Mitron's commercially available products. Within the context of the RASSP-MI, the source of the GenCAD data is STEP AP210 (as discussed in Section 2.2)

The capabilities of the manufacturing facility are captured by the PA and stored as parameters to a set of rules developed specifically for the hosting facility. Using this information, the PA evaluates producibility with respect to specific production lines and generates producibility reports.

Please refer to Mitron's documentation for a full discussion of the operational details and capabilities of the Producibility Analyzer.

2.5 Rule Definition/Execution Facility (RD/EF)

To pose and act on multi-domain questions, facilities were developed to define and execute Design For X (DFx) rules. A Rules Definition Facility (RDF) was developed to define generic DFx rules. A Rules Execution Facility (REF) was developed to execute the defined rules against STEP Application Protocol data.

2.5.1 Rules Definition Facility

The Rules Definition Facility (RDF) is a database editor designed to assist engineers in capturing PCA related design and manufacturing process knowledge in the form of rules. The rules are stored in an object oriented database for future use in an integrated knowledge based framework or system.

Using the Rules Definition Facility, rules can be created, edited and/or removed. Rule meta information (concerning rule approval, origination, description, justification, etc.) can be defined. Rule execution code, premise and conclusion components, can be created and edited using context sensitive menus. The rule premise component, or "IF" statement conditions, define what actions are required before the rule conclusion component is executed. The rule premise consists of logical combinations (ANDing or ORing) of system functions. System functions include: storing temporal information to the database (facts), storing permanent information to the database (object attributes) and providing feedback to the user in the form of messages and issues. The conclusion component consists of actions to take as a result of all of the premise conditions being met. The rule conclusion is a logical combination (ANDing) of system functions. The Bachus-Naur Form (BNF) grammar description provided in Figure 2.5.1-1 defines the rule definition format.

Note that a rule conclusion can include the storing of facts and/or object attributes (system functions). A rule premise may include functions that test facts and/or object attributes. Utilizing the two preceding capabilities allows one rule to call another rule. This process is known as 'chaining'. This ability can be used to capture the intent of a multistage rule with several smaller rules. Additionally, it allows the system to continually ask new questions when the answers from other questions support information needed by the new questions.



<rule> ::= <premise> <conclusion>
<premise> ::= <complex clause> { Or <complex clause> }*
<complex clause> ::= <simple clause> { And <simple clause> }*
<simple clause> ::= <system function> <function parameter>*
<conclusion> ::= <simple clause> { And <simple clause> }*
<function parameter> ::= <simple clause> | <constant> | <variable><variable> - Alphanumeric pattern instantiated as object when rule is fired (e.g. component1, layer2, net3).
<constant> - Number, Integer or Floating Point
<system function> - Any system provided function that returns a value for
testing or comparison (e.g. logical, math)
Note: This Backus-Naur Form has been extended using the Kleene cross (sequence of one or more) and the Kleene Star (sequence of zero or more).
Figure 2.5.1-1 -- Backus-Naur Form for Rules


Information defined in the Rules Definition Facility can be stored in the database and later executed using the Rules Execution Facility (REF).

The Rules Definition Facility organizes rules by status and set. Rule status defines the progress of a rule in the process of defining, submitting and accepting rules. Rule sets are user defined categories that aid in organizing rules into small, meaningful groups. In the RDF, rules are selected either by their current status or by the rule set that they belong to.

When rules are first created their status is initialized to proposed. A proposed rule contains only meta-data about the rule (its description, justification, etc.). Note the Rules Definition Facility allows the user to input rule detail via the Rule Edit Panel on a proposed rule. Proposed rules are the only rules that can be deleted.

A proposed rule can either be accepted or rejected. If the rule is rejected, rejection information is requested, its status is changed to rejected and the rule can no longer be edited. If the rule is accepted, its status is changed to inwork and the rule can be edited. Inwork rules are typically used in conjunction with the Rules Execution Facility in an edit/execute/ cycle. Once editing is completed on an inwork rule, it can be submitted for approval or disapproval. The status of the inwork rule is changed to submitted while the approval process is taking place. If the submitted rule is disapproved, disapproval information is requested, its status is changed to disapproved and the rule can no longer be edited. If the submitted rule is approved, its status is changed to approved. If an approved rule has defined a rule that it supersedes, then that rule will have its status changed to superseded. Any rule can be demoted to proposed by using the demote rule menu selection. Figure 2.5.1-2 depicts the state diagram that shows how the state of a rule may change over time.

Figure 2.5.1- 2: Rule Status Process Flow


To simplify the task of defining and executing rules, the Rules Definition Facility provides for the organization of rules into rule sets. A rule set is a group of rules that share a common subject. Rule sets are arranged in a rule hierarchy. The rule sets and their hierarchy are defined by the user. As an example, a user may wish to define a set of design rules. Subsets of rules under the design set could be analog, digital and mixed.

A rule can belong to any number of rule sets. When rules are executed in the Rules Execution Facility they must first be selected via rule set. Figure 2.5.1-3 depicts an example of a rule set hierarchy and its associated rule sets.

2.5.2 Rules Execution Facility

The goal of rules execution is to discover and report issues that exist concerning a product. The Rules Execution Facility is used to execute PCA related rules as defined by the Rules Definition Facility. Product data for a specific PCA (AP210) is created by executing the appropriate data converter. Manufacturing data is loaded from the manufacturing database created by the Manufacturing Resource Editor.

Figure 2.5.1- 3: Example Rule Sets and Hierarchy

Other data, available in STEP format, can be loaded at the users option. Rule results are displayed in the form of messages, dialog boxes, rule result files and rule issues. The REF allows the execution of both Approved and Inwork rules. Rules defined in rule sets can be selected and added to the rule agenda. Individual rules, rule sets, or all rules can be executed.

System Operation

The Rules Execution Facility Main Panel provides functionality to select rules sets and their associated rules for placement on the rule agenda. Rules on the rule agenda can be executed as required. Figure 2.5.2-1 shows the layout of the REF's user interface.

Figure 2.5.2- 1: REF Main Panel Window Locations

Selecting Rules by Status

The Rule Sets window (located on the left of the REF Main Panel) displays the defined sets for the currently selected rule status. Rule status is selected at the bottom of the Rule Sets window. The Rule Execution Facility supports the execution of Inwork and Approved rules (as defined by the Rules Definition Facility).

Selecting Approved Rules

Selecting the Approved Rule Status check box updates the Rules by Set listing with Approved rule sets and their associated number of rules. All inwork rules are removed from the Rule Agenda. Previously selected approved rules will be added to the Rule Agenda.

Selecting Inwork Rules

Selecting the Inwork Rule Status check box updates the Rules by Set listing with Inwork rule sets and their associated number of rules. All approved rules are removed from the Rule Agenda. Previously selected inwork rules will be added to the Rule Agenda.

Selecting Rules by Set

The Rule Sets window (located on the left of the REF Main Panel) displays the defined sets for the currently selected rule status. Left clicking on a rule set will toggle that particular set (either selecting or deselecting) and add/remove its rules to/from the Rule Agenda. Using the Rule Sets Reset checkbox, all rule sets can be deselected (using the NONE selection) or all rule sets can be selected (using the ALL selection).

Working with the Rule Agenda

Only rules defined on the Rule Agenda can be executed. Selecting rules sets place the rules defined to that set on the Rule Agenda. Individual or groups of rules can be removed from the Rule Agenda. All rules, individual rules, or groups of rules on the Rule Agenda can be executed.

Resetting Rules in the Rule Agenda

As rules sets are selected, their associated rules are added to the Rule Agenda. Individual rules can be removed. The Reset Agenda button is used to reset the Rule Agenda to display all of the rules associated with the selected rule sets, as well as remove any rule execution information associated with these rules.

Adding Rules to the Rule Agenda

As rules sets are selected, their associated rules are added to the Rule Agenda. Selecting and deselecting rule sets adds and removes their rules to and from the Rule Agenda.

Removing Rules from the Rule Agenda

As rules sets are selected, their associated rules are added to the Rule Agenda. Selecting and deselecting rule sets adds and removes their rules to/from the Rule Agenda. The Remove Selected Rules button is used to remove individual rules from the Rule Agenda. Rules to be removed must first be selected in the Rule Agenda window.

Updating the Rule Execution Data on the Rule Agenda

Each time a rule is executed a record of execution attempts and successes is stored. The Update Rule Execution Data button displays the execution record for the rules on the Rule Agenda.

Resetting the Rule Execution Data on the Rule Agenda

Each time a rule is executed a record of execution attempts and successes is stored. The Reset Rule Results when Rules are Execution button will clear any rule execution results whenever a rule is initiated.

Executing Rules

Rules on the Rule Agenda (either all of the rules or a selected subset) can be executed. The Run Selected Rules button is used to execute only those rules in the Rule Agenda that are selected. The Run All Rules button is used to execute all the rules in the Rule Agenda.

Rule Execution Information

As rules are executed the Rules Execution Facility provides summary information concerning the number of rules that are attempted and the number of rules that succeed. Table 2.5.2-1 describes the available summary information.

Table 2.5.2-1 -- Rule Execution Information
 
Rule Summary Type  Description 
Individual Rules Attempted  Number of different rules that are attempted 
Individual Rules Succeeded  Number of different rules that succeed 
Total Rules Attempted  Total number of rules (some rules are counted more than once) that are attempted 
Total Rules Succeeded  Total number of rules (some rules are counted more than once) that succeed 


Debugging Rules

To aid in debugging the execution of rules, the Rules Execution Facility supports the reporting of attempted rules and succeeded rules.

Reporting Attempted Rules

The Report Attempted Rules button is used to report the name of each rule as it is attempted. The rules object and name are displayed in the Message Panel and printed to the REF log file. Note that if many rules are attempted, this reporting will slow down execution considerably.

Reporting Succeeded Rules

The Report Succeeded Rules button is used to report the name of each rule if it succeeds. The rules object and name is displayed in the Message Panel and printed to the REF log file. Note that if many rules succeed, this reporting will slow down execution considerably.

Stopping Rules

Once rule execution is initiated it will continue until all selected rules are executed. The Stop Rules button will stop the execution mechanism from starting any new rules. The currently executing rule will run to completion. There is presently no elegant way of halting the currently executing rule.

Displaying Rule Facts

Rules can write facts for temporary use by other rules or for storing temporary knowledge (e.g. number of components, maximum component height, etc.). The facts are written in response to rule premises or conclusions that include the function PutFact or PutFacts. The Display Facts button allows the display of all presently defined facts. When selected a dialog list box is provided that lists each fact, attribute and value triplet. If no facts are presently defined, a message stating so will be displayed. Note that when rules are executed (either by the Run Selected Rules button or the Run All Rules button), existing facts will not be deleted.

Clearing Rule Facts

Rules can write facts for temporary use by other rules or for storing temporary knowledge (e.g. number of components, maximum component height, etc.). The facts are written in response to rule premises or conclusions that include the function PutFact or PutFacts. The Clear Facts button allows the removal of all accumulated facts and their attributes.

2.6 Web-based interface

The web-based interface to the RASSP Manufacturing Interface enables users of the system to access the capabilities of the RASSP-MI remotely. The implementation is currently limited to providing remote access to the Producibility Analyzer, but can be extended to include other subsystems of the RASSP-MI in the future. Figure 2.6-1 shows the architecture of the web-based interface.

Figure 2.6- 1: Architecture of the Web-based Interface

An integral component of the interface is the Citrix Winframe server software, which extends the capabilities of Windows NT. The Citrix Winframe technology acts as a redirectable layer between Windows NT applications and the Windows NT rendering layer. On the server machine, an application's display calls are intercepted by Winframe and redirected to a remote client machine. A Citrix compliant plug-in must be running on the client machine to interpret the incoming data stream and generate the application GUI. The plug-in for Windows 95 and Windows NT is freely available at http://www.citrix.com . The plug-in for UNIX is available for a nominal fee. The Winframe server is built into the operating system; a special version of Windows NT modified by Citrix must be purchased for the server machine.

Once the Citrix client plug-in is installed, the Producibility Analyzer can be accessed from a site hosting the RASSP Manufacturing Interface. The RASSP-MI can be installed such that its capabilities can be accessed via the Internet, or only through the corporate intranet.

For more details on the technology underlying the web-based interface and a discussion of alternate approaches to providing remote access to RASSP-MI capabilities, see [SCRA97].